Global Regulatory Monitor Regulatory News, Week 4 · 2026/8
Period 2026-08-17 ~ 2026-08-24Published 2026-08-24Collected 83 · 26 cardsEvidence A 15 · B 11 · C 0
7 cards in this issue cover Korean regulator documents. Company and institution names, and quoted source text, are shown in Korean exactly as they appear on the official record.
This week's key points
FDA classes a Cyclophosphamide for Injection recall as Class I after particulate identified as stainless steel is found in product made by Sunny Pharmtech
Health Canada recalls B. Braun Lactated Ringer's Injection USP as Type I after particulate matter is found
MFDS recall covers three repaglinide products after N-nitroso-melumine is detected above the limit
About AI-generated content
Summaries, translations, implications, check items, and in-depth analysis are written by generative AI; figures, quotations, links, and machine-extracted tables are provided as in the source. This is reference material — check the official source before making decisions.
[Warning Letter · FDA]Suretec Innovations, LLC — No identity testing of incoming components
Evidence BFDASignal High · T3CGMP
FDA issued a warning letter to Suretec Innovations, LLC for CGMP violations, including failure to test samples of each component for identity and for conformity with written specifications, and failure to establish the reliability of the supplier's certificates of analysis.
Published
2026-08-18
Document no.
530821d5b169
Company / site
Suretec Innovations, LLC
Issuing office / date
Center for Drug Evaluation and Research (CDER) · 08/13/2026
Key facts · Basis: official index plus supporting sources
Finding: samples of each component were not tested for identity and for conformity with written specifications for purity, strength and quality
Classification: CGMP, finished pharmaceuticals, adulterated and misbranded
Issued: Center for Drug Evaluation and Research (CDER), dated 13 August 2026 and posted 18 August 2026
Insight · Editorial insight
Treating reliance on a supplier's certificate of analysis as a CGMP violation in its own right signals that FDA reads incoming material control at a contract finished-product site as testing the firm does, not testing it accepts. Sites should confirm they hold identity testing per incoming lot and documented evidence that supplier certificates have been validated.
Check points
Whether identity testing is performed on each incoming lot of components
Records of periodic revalidation of the reliability of supplier certificates of analysis
Whether component specifications cover purity and strength testing in full
Violation detail · 4 items · From the source
Violation 121 CFR 211.84(d)(1)
Your firm failed to test samples of each component for identity and conformity with all appropriate written specifications for purity, strength, and quality. Your firm also failed to validate and establish the reliability of your component supplier’s test analyses at appropriate intervals (21 CFR 211.84(d)(1) and 211.84(d)(2)).
Violation 221 CFR 211.165(b)
Your firm failed to conduct appropriate laboratory testing, as necessary, for each batch of drug product required to be free of objectionable microorganisms (21 CFR 211.165(b)).
Violation 321 CFR 211.192
Your firm failed to thoroughly investigate any unexplained discrepancy or failure of a batch or any of its components to meet any of its specifications, whether or not the batch has already been distributed (21 CFR 211.192).
Violation 421 CFR 211.22
Your firm’s quality control unit failed to exercise its responsibility to ensure drug products manufactured are in compliance with CGMP, and meet established specifications for identity, strength, quality, and purity (21 CFR 211.22).
[Warning Letter · FDA]Eugia Pharma Specialities Limited — RABS design gaps on an aseptic line
Evidence BFDASignal High · T3CGMP
FDA issued a warning letter to the Unit I sterile injectable site of Eugia Pharma Specialities Limited, inspected 16 to 27 February 2026, citing CGMP violations that included restricted access barrier system design defects and inadequate environmental monitoring.
Published
2026-08-18
Document no.
82c88d4e8699
Company / site
Eugia Pharma Specialities Limited
Issuing office / date
Center for Drug Evaluation and Research (CDER) · 08/13/2026
Key facts · Basis: official index plus supporting sources
Finding: operations were not carried out within defined areas of adequate size, and separate or defined areas or other control systems needed to prevent contamination or mix-ups were absent (21 CFR 211.42(c)(10))
Finding: poor aseptic technique and failure to reflect significant interventions in media fills (21 CFR 211.113(b))
Recurrence: Unit II and Unit III of the same company are also classified Official Action Indicated
Action: response within 15 working days, with an independent risk assessment of contamination hazards and a line redesign plan required
Insight · Editorial insight
FDA's sterile enforcement has moved past correcting operator behaviour to challenging the physical design of the barrier system and the frequency of intervention itself. Sterile injectable sites should re-examine the number of manual interventions per batch and the degree of separation in extended ISO 5 zones as a design question rather than a training one.
Check points
Risk assessment records for interventions per batch, by number and by type
Whether media fill requalification includes worst-case interventions
Adequacy of environmental monitoring limits for the extended ISO 5 zone
Violation detail · 2 items · From the source
Violation 121 CFR 211.42(c)(10)
Your firm failed to perform operations within specifically defined areas of adequate size and to have separate or defined areas or such other control systems necessary to prevent contamination or mix-ups in aseptic processing areas (21 CFR 211.42(c)(10)).
Violation 221 CFR 211.113(b)
Your firm failed to establish and follow appropriate written procedures that are designed to prevent microbiological contamination of drug products purporting to be sterile, and that include validation of all aseptic and sterilization processes (21 CFR 211.113(b)).
[Warning Letter · FDA]Auriga Research Pvt. Ltd. — Incomplete test records, OOS invalidated
Evidence BFDASignal High · T3CGMP
FDA issued a warning letter to the Indian contract testing laboratory Auriga Research Pvt. Ltd., inspected 4 to 6 February 2026, citing CGMP violations that included laboratory records without complete raw data and out-of-specification results invalidated without justification.
Published
2026-08-18
Document no.
9d6c0258c199
Company / site
Auriga Research Pvt. Ltd.
Issuing office / date
Center for Drug Evaluation and Research (CDER) · 08/12/2026
Key facts · Basis: official index plus supporting sources
Finding: laboratory records did not include complete data from all tests needed to show compliance with specifications and standards, and were not recorded contemporaneously (21 CFR 211.194(a))
Finding: out-of-specification results were invalidated after retesting produced a passing result, without a scientifically justified root cause
Finding: the quality unit reviewed and approved those out-of-specification investigations (21 CFR 211.22(d))
Action: an independent retrospective review of every out-of-specification result for US-bound product over the past three years
Insight · Editorial insight
FDA is treating a contract testing laboratory as an extension of the sponsor's site, so a data integrity defect at the laboratory is read as a conformity problem for every product it tested. Firms using contract laboratories should make out-of-specification history and the way raw data is recorded standing items in the supplier audit.
Check points
Contemporaneous recording of raw data and ALCOA compliance at the contract laboratory
Level of documented scientific root cause required before an out-of-specification retest is approved
Scope of the review of out-of-specification and invalidation history during contract laboratory audits
Violation detail · 2 items · From the source
Violation 121 CFR 211.194(a)
Your firm failed to ensure that laboratory records included complete data derived from all tests necessary to ensure compliance with established specifications and standards (21 CFR 211.194(a)).
Violation 221 CFR 211.22(d)
Your firm failed to establish adequate written responsibilities and procedures applicable to the quality control unit (21 CFR 211.22(d)).
[Warning Letter · FDA]K.C. Pharmaceuticals, Inc. — Release continued after media fill failures
Evidence BFDASignal High · T3CGMP
FDA issued a warning letter to K.C. Pharmaceuticals, Inc. for CGMP violations, including continuing to manufacture and release sterile products after media fill failures and inadequate airflow visualisation studies.
Published
2026-08-18
Document no.
c0f3b8ff757d
Company / site
K.C. Pharmaceuticals, Inc.
Issuing office / date
Center for Drug Evaluation and Research (CDER) · 08/12/2026
Key facts · Basis: official index plus supporting sources
Finding: sterile drug products continued to be manufactured and released after media fill failures on 21 June, 4 September and 4 November 2024 (21 CFR 211.113(b))
Finding: inadequate smoke studies for airflow visualisation, repeating a finding from a warning letter dated 3 August 2023
Action: on 18 February 2026 the firm voluntarily recalled product manufactured between 2024-03-27 and 2024-11-07 and stopped filling operations
Finding: no stability indicating method was established and testing timepoints were missed
Insight · Editorial insight
Deciding not to treat a media fill failure as a hold signal ended in a recall covering the whole intervening production period, and FDA used that outcome as evidence that the corrective actions were not effective. Sterile sites should confirm their procedures state, in writing, the criteria for holding or recalling product made in the period covered by a failed media fill.
Check points
Criteria for holding or recalling product made during the period covered by a failed media fill
Whether smoke studies are run under dynamic conditions and from adequate camera positions
Whether the stability indicating method for sterile products is validated
Violation detail · 5 items · From the source
Violation 121 CFR 211.113(b)
Your firm failed to establish and follow appropriate written procedures that are designed to prevent microbiological contamination of drug products purporting to be sterile, and that include validation of all aseptic and sterilization processes (21 CFR 211.113(b)).
Violation 221 CFR 211.100(a)
Your firm failed to establish adequate written procedures for production and process control designed to assure that the drug products you manufacture have the identity, strength, quality, and purity they purport or are represented to possess (21 CFR 211.100(a)).
Violation 321 CFR 211.166(a)
Your firm failed to establish and follow an adequate written testing program designed to assess the stability characteristics of drug products (21 CFR 211.166(a)).
Violation 4
Your firm failed to establish laboratory controls that include scientifically sound and appropriate specifications, standards, sampling plans, and test procedures designed to assure that components, drug product containers, closures, in-process materials, labeling, and drug products conform to appropriate standards of identity, strength, quality, and purity (21 CFR (211.160(b)).
Violation 521 CFR 211.22(d)
Your firm failed to establish adequate written responsibilities and procedures applicable to the quality control unit and to follow written procedures applicable to the quality control unit (21 CFR 211.22(d)).
[Warning Letter · FDA]Safrel Pharmaceuticals LLC — No quality unit, poor warehouse control
Evidence BFDASignal High · T3CGMP
FDA issued a warning letter to Safrel Pharmaceuticals LLC, which stores, labels and ships own-label OTC drug products, citing CGMP violations that included the absence of an adequate quality unit and no oversight of suppliers and contract manufacturers.
Published
2026-08-18
Document no.
eb1e680fec98
Company / site
Safrel Pharmaceuticals LLC
Issuing office / date
Center for Drug Evaluation and Research (CDER) · 08/07/2026
Key facts · Basis: official index plus supporting sources
Finding: no adequate quality unit was established, and its responsibilities and procedures were not in writing or fully followed (21 CFR 211.22(a))
Finding: certificates of analysis for incoming components and finished products were neither requested nor retained, and there were no quality agreements with suppliers
Finding: unlabelled and labelled finished products were stored together in the warehouse (21 CFR 211.42)
Finding: with no procedure to trace distribution by lot, a recall would be difficult to execute
Insight · Editorial insight
An own-label distributor that does no manufacturing itself, only labelling, storage and distribution, is still treated by FDA as carrying full CGMP responsibility. Firms placing products with contract manufacturers should check that their own quality unit holds real oversight authority and the records to show it.
Records of receipt and review of certificates of analysis for incoming finished product
Traceability of shipment and distribution at lot level
Violation detail · 1 item · From the source
Violation 121 CFR 211.22(a) · 21 CFR 211.22(d)
Your firm failed to establish an adequate quality unit and the responsibilities and procedures applicable to the quality unit are not in writing and fully followed (21 CFR 211.22(a) and 21 CFR 211.22(d)).
The Belgian national competent authority issued a GMP non-compliance statement for the active substance site of Lianyungang Guike Pharmaceutical Co. Ltd. in China, based on 21 deficiencies against EU GMP identified during an inspection under the EDQM inspection programme.
Published
2026-08-21
Document no.
187127
Site / company
Lianyungang Guike Pharmaceutical Co. Ltd. (China)
Issuing authority (NCA)
Belgium
Product scope
Human Medicinal Products
Original text and translation
During the inspection of the manufacturing site, in the frame of EDQM’s inspection progamme, 21 deficiencies against EU GMP were identified.
Key facts · Basis: official source record kept by the collector
Finding: one of the 21 deficiencies was classified critical - inadequate management of contamination and cross-contamination risk on shared equipment and an inadequate contamination control strategy
Finding: five major deficiencies covering cleaning validation, preventive maintenance and equipment condition, data integrity, change control, and batch release and conformity with the CEP
Action: prohibition of supply recommended and variation of marketing authorisations to be assessed, with EDQM suspending all CEPs held by the company
Scope: human medicinal products, manufacture of active substance and active substance intermediate
Insight · Editorial insight
For an active substance site running shared equipment, the EU is judging the specificity of the contamination control strategy and the evidence that it is applied at critical level, and the non-compliance statement fed straight through to CEP suspension. Products relying on the affected CEP material should review alternative sources and the need for a variation early.
Check points
Whether the contamination control strategy document is held for suppliers running shared equipment
Alternative source and change plan for products using material covered by the suspended CEPs
Cleaning validation evidence for shared equipment handling highly potent substances
Non-compliance detail · From the source · EudraGMDP
Issuing NCA · BelgiumHuman Medicinal Products
Non-compliant operations
Original · EudraGMDP
1NON-COMPLIANT MANUFACTURING OPERATIONS
1.4Other products or manufacturing activity
1.4.3Other: Active substance and active substance intermediate(en)
Nature of non-compliance
Original · EudraGMDP
During the inspection of the manufacturing site, in the frame of EDQM’s inspection progamme, 21 deficiencies against EU GMP were identified. One deficiency was classified as critical due to inadequate control of contamination and cross-contamination risk in shared facilities. The risk assessments and contamination control strategy for Workshop 2 and the dispensing area were insufficiently robust, specific, justified, and effectively implemented, notably for exposed product operations, gowning, area and equipment cleanliness, material entry, dispensing activities, and the use of shared equipment for potentially highly potent products. Furthermore, absence of contraindications between APIs manufactured in the shared facility was not evaluated consistently. These represent a potential risk to patient safety. Five deficiencies were classified as major and were related to the following areas: cleaning validation and cleaning procedures, preventive maintenance and equipment condition, data integrity, change control management, and batch release and compliance to CEP. In addition, 15 other deficiencies were found (i.e. records, quality system, personnel training, calibration, labelling management, equipment qualification).
Action taken/proposed
Original · EudraGMDP
Requested Variation of the marketing authorisation(s) For medicinal products containing APIs manufactured by LIANYUNGANG GUIKE PHARMACEUTICAL CO. LTD. in Workshop 2, assessment of the MA to remove or substitute this manufacturer of active substances and intermediates should be considered. In addition, no new MAs should be granted for products relying on this API source while the statement of non-compliance remains in force. Recall of batches already released If there are alternative suppliers and there is no risk of shortage, recall of medicinal product should be evaluated by the involved NCAs following assessment conducted in conjunction with MAHs. Prohibition of supply Due to the nature of the non-compliance, prohibition of supply is recommended, unless there are no alternative suppliers and there is a risk of shortage. Suspension or voiding of CEP (action to be taken by EDQM) The EDQM had taken the decision to suspend all granted CEPs from LIANYUNGANG GUIKE PHARMACEUTICAL CO. LTD. CEP 2013-019 Atracurium besilate CEP 2021-236 Cisatracurium besilate CEP 2017-271 Entecavir monohydrate (intermediate)
[Warning Letter · FDA]Tianjin Kilo Pharmaceutical Sci-tech Co., Ltd. — API supplied without process validation
Evidence BFDASignal High · T3CGMP
FDA reviewed records requested under section 704(a)(4) and issued a warning letter to the Chinese active ingredient site Tianjin Kilo Pharmaceutical Sci-tech Co., Ltd., finding no process validation, no analytical method validation or verification, and no stability programme.
Published
2026-08-18
Document no.
98b0ec48f22e
Company / site
Tianjin Kilo Pharmaceutical Sci-tech Co., Ltd.
Issuing office / date
Center for Drug Evaluation and Research (CDER) · 08/06/2026
Key facts · Basis: official index plus supporting sources
Finding: active pharmaceutical ingredients were manufactured without process validation and supplied to US 503A compounding pharmacies
Finding: master production and control records were incomplete, and there was no validation or verification of analytical methods and no stability testing programme
Action: on 21 July 2026 all products from the firm were placed on Import Alert 66-40
Additional: demecarium bromide and chlorambucil were held to be misbranded for failure to list the products
Insight · Editorial insight
This is a case where FDA acted against an overseas active ingredient site on a written records request alone, without an inspection, and the gap between the firm's claim that it was at development stage and the actual distribution data was decisive. Firms should periodically confirm that overseas API suppliers hold process validation reports and check whether they appear on an import alert.
Check points
Whether process validation reports are held for overseas API suppliers
Evidence of analytical method validation, or verification of compendial methods, for the active ingredient
Continuous monitoring of whether any supplier in use is listed on an import alert
[Guidance · FDA]GNT USA, LLC.; Filing of Color Additive Petition — Color additive petition filed
Evidence AFDASignal Med · T2Guidance
FDA announced in the Federal Register that it has filed a color additive petition submitted by GNT USA, LLC.
Published
2026-08-19
Document no.
2026-16939
Issuing authority
FDA
Topic
GNT USA, LLC.; Filing of Color Additive Petition
Original text and translation
The Food and Drug Administration (FDA or we) is announcing that we have filed a petition, submitted by GNT USA, LLC., c/o Exponent, Inc.
Key facts · Basis: official source record kept by the collector
Content: the petition asks that the color additive regulations be amended to allow the use of a color derived from safflower (Carthamus tinctorius L.)
Issued: FDA, 19 August 2026, document 2026-16939
Status: notice of filing only - the outcome of the review cannot be determined from it
Insight · Editorial insight
A change to the color additive regulations does not itself change manufacturing requirements, but it does affect the listed status of colorants in the supply chain. Products that use colorants are worth keeping the regulatory listing status of those colorants under routine watch.
Check points
Procedure for confirming the regulatory listing status of colorants used in drug products
[Guidance · FDA]Gardenia Blue Interest Group; Filing of Color Additive Petit… — Gardenia blue petition filed
Evidence AFDASignal Med · T2Guidance
FDA announced in the Federal Register that it has filed a color additive petition submitted by the Gardenia Blue Interest Group.
Published
2026-08-19
Document no.
2026-16944
Issuing authority
FDA
Topic
Gardenia Blue Interest Group; Filing of Color Additive Petition
Original text and translation
The Food and Drug Administration (FDA or we) is announcing that we have filed a petition, submitted by Gardenia Blue Interest Group (GBIG or petitioner), c/o Exponent, Inc.
Key facts · Basis: official source record kept by the collector
Content: a color additive petition submitted by the Gardenia Blue Interest Group (GBIG) through Exponent, Inc. has been filed
Issued: FDA, 19 August 2026, document 2026-16944
Status: notice of filing only - the outcome of the review cannot be determined from it
Insight · Editorial insight
Petitions for naturally derived colors arriving one after another in the same period show the move away from synthetic colors passing into the regulatory process itself. Products considering a change of colorant should track how far the alternative color has progressed towards listing.
Check points
Plan for obtaining specifications and test methods when switching to a naturally derived colorant
Scope of stability data required to support a change of colorant
[WHO · WHO]Farmabios (Corp) — WHO public inspection report
Evidence BWHOSignal Med · T2WHO
WHO published a public inspection report (WHOPIR) covering the desk assessment of the Farmabios (Corp) site dated 16 June 2026.
Inspection date
2026-06-16
Document no.
who-whopir-3966feb0593f
Topic
Farmabios (Corp)
Issuing authority
WHO
Key facts · Basis: official index plus supporting sources
Site: Farmabios (Corp)
Desk assessment date: 16 June 2026
Publication: WHO public inspection report, carrying the conclusion and the inspection relied upon (AIFA)
Insight · Editorial insight
As WHO prequalification outcomes are published, the GMP history of an API supplier becomes verifiable from outside the supply relationship. This one was concluded by desk assessment on the evidence of another regulator's inspection rather than an onsite visit, so anyone carrying this site in their supply chain should hold the conclusion and the list of relied-upon inspections as supplier assessment evidence.
Check points
Obtain the WHOPIR text for the site and review the findings
Whether WHO inspection history is reflected in supplier assessment records
Inspection report detail · From the source · WHO
Inspection outcome
Original · WHOPIR
Based on the previous WHO desk assessment and on the GMP evidence received and reviewed, it is considered that a desk assessment is acceptable in lieu of a WHO onsite inspection. The site Farmabios S.p.A. located at Via Pavia, 1, 27027 Gropello Cairoli, Pavia, Italy is considered to be operating at an acceptable level of compliance with WHO GMP guidelines. This WHOPIR will remain valid for 3 years, provided that the outcome of any inspection conducted during this period is positive.
[WHO · WHO]Neuland Labs (Corp and Unit 1) — WHO public inspection report
Evidence BWHOSignal Med · T2WHO
WHO published a public inspection report (WHOPIR) covering the desk assessment of Neuland Labs (Corp and Unit 1) dated 8 June 2026.
Inspection date
2026-06-08
Document no.
who-whopir-5498869144c8
Topic
Neuland Labs (Corp and Unit 1)
Issuing authority
WHO
Key facts · Basis: official index plus supporting sources
Site: Neuland Labs (Corp and Unit 1)
Desk assessment date: 8 June 2026
Publication: WHO public inspection report, carrying the conclusion and the inspections relied upon (USFDA, EDQM and ANSM)
Insight · Editorial insight
A desk assessment covering the corporate entity together with an individual unit means results have to be read at site level even within one company. Products using material from this company should check that the site actually manufacturing their material falls within the scope of this report.
Check points
Compare the site actually manufacturing the material in use against the scope of the report
Keep inspection outcomes separated by site within the same corporate group
Inspection report detail · From the source · WHO
Inspection outcome
Original · WHOPIR
Based on the GMP evidence received and reviewed, it is considered that a desk assessment is acceptable in lieu of a WHO onsite inspection. The site Neuland Laboratories Limited, Unit-I located at Sy. No.: 291, 346P, 347, 348P, 473, 474, 490/2, Veerabhadraswamy Temple Road, Domadugu Village, Bonthapally Village, Gummadidala Mandal, Sangareddy District, Pin code 502 313, Telangana State, India, is considered to be operating at an acceptable level of compliance with WHO GMP guidelines for APIs. This WHOPIR will remain valid for 3 years, provided that the outcome of any inspection conducted during this period is positive.
[WHO · WHO]ACDIMA BioCenter (Amman) — WHO public inspection report
Evidence BWHOSignal Med · T2WHO
WHO published a public inspection report (WHOPIR) covering its inspection of ACDIMA BioCenter (Amman) on 21 April 2026.
Inspection date
2026-04-21
Document no.
who-whopir-523b95281ed1
Topic
ACDIMA BioCenter (Amman)
Issuing authority
WHO
Key facts · Basis: official index plus supporting sources
Site: ACDIMA BioCenter (Amman)
Inspection date: 21 April 2026
Publication: WHO public inspection report, carrying the conclusion and 21 summarised sections
Insight · Editorial insight
WHO is bringing testing and research organisations, not only manufacturing sites, within the scope of published inspection reports. Firms using overseas contract organisations can use the availability of a WHOPIR as one input when selecting them.
Check points
Procedure for checking WHO inspection history when selecting an overseas contract organisation
Follow-up on findings recorded in a contract organisation's inspection report
Inspection report detail · From the source · WHO · Item 21
Inspection outcome
Original · WHOPIR
Based on the areas inspected, the people met and the documents reviewed, and considering the findings of the inspection, including the observations listed in the Inspection Report, ACDIMA BioCenter located at 18th Salah Shimat St, Sweifieh, Amman, Hashemite Kingdom of Jordan was considered to be operating at an acceptable level of compliance with WHO GCP and applicable BE guidelines. The deficiencies observed during the inspection, as listed in the full report, were addressed by the ACDIMA BioCenter to a satisfactory level before the publication of the WHOPIR. This WHOPIR will remain valid for 3 years, provided that the outcome of any inspection conducted during this period is positive.
1. Organization and management
Original · WHOPIR
A presentation was provided that explained the organization’s activities in detail. ACDIMA BioCenter operated in accordance with the principles of GCP and GLP, as endorsed by JFDA in the declaration letter (Appendix 2 of CRO Master File: ACDIMA BioCenter JFDA GCP–GLP Certificate). The CRO indicated the outcome of the previous WHO inspection as accreditation. The CRO was notified and subsequently removed the incorrect information from its website during the inspection. The CRO committed to revising the other relevant documentation, including the Quality Manual. …
2. Computer systems
Original · WHOPIR
The ACDIMA BioCenter Software Validation Master Plan effective 28 December 2025, was established to ensure that computerized systems were suitable for their intended purpose and were validated, operated, and maintained in accordance with GCP and GLP principles, as appropriate. Risk assessments were required and were performed using the Failure Mode and Effects Analysis (FMEA) tool, in accordance with the respective SOP, every two years or upon installation of new software. An inventory of all computerized systems on the network was available. …
3. Quality management
Original · WHOPIR
The CRO had established appropriate QA and QC systems, supported by written SOPs, to ensure that trials were conducted and that data were generated, documented, and reported in compliance with the protocol, GCP, GLP, and applicable regulatory requirements. A Quality Manual, dated 18 March 2026, was provided and reviewed. …
4. Archive facilities
Original · WHOPIR
The archive facility had been successfully inspected during the previous inspection. It was confirmed that adequate access control was in place, with authorized personnel clearly identified. Records of file movements were maintained and reviewed.
5. Premises
Original · WHOPIR
During the inspection, a tour of the facility was conducted. On Day 1, the CPU on the 3rd floor was visited during sample collection. The facilities were clean and equipped with adequate lighting, ventilation, and environmental controls. Floors, walls, and workbench surfaces were easy to clean and decontaminate. Bioequivalence studies were conducted under conditions that ensured the safety of subjects. The selected site was appropriate for the level of risk involved. The CRO had sufficient space to accommodate the personnel and activities required to perform the studies. …
6. Personnel
Original · WHOPIR
A sufficient and qualified team of medical, paramedical, technical, and clerical staff was available to support the trial and respond effectively to foreseeable emergencies. At all stages of the trial, including during night hours, qualified and trained personnel were present to ensure that subjects’ rights, safety, and well-being were safeguarded and that appropriate care was provided in cases of emergencies. Contract workers were engaged for specific activities to complement the team’s capabilities. …
7. Clinical phase
Original · WHOPIR
The clinical phase of the studies was performed at the CRO premises. The inspection team was informed that the facility had expanded its operations by establishing a second clinical site and a dedicated hospital-based facility for studies requiring hospital care, participant admission, and continuous 24-hour medical supervision. The CPU was equipped with 144 beds. Systems were in place in the accommodation areas to enable subjects to alert CRO staff as needed. Each subject was provided with a badge and a bracelet indicating the study number and subject number. …
8. Clinical laboratory
Original · WHOPIR
A suitable clinical laboratory was used for sample analysis. The laboratory was accredited by JFDA and ISO 15189 (accredited in 2020; last assessment conducted on 9 February 2026). Hematological tests, urine analysis, and other investigations were performed during the clinical trial as specified in the study protocol. Procedures for sample labeling, receipt, storage, and chain of custody ensured full traceability and integrity. Samples received from the clinical site were handled by laboratory technicians, accompanied by the corresponding documentation. …
9. Ethics
Original · WHOPIR
The study trial was approved by the Independent Ethics Committee (IEC), with the first amendment approved on 26 May 2025 and the second amendment on 29 May 2025. The second amendment was implemented prior to dosing, after the screening phase, and involved a change in the volume of water administered during dosing from 20 ml to 40 ml, in accordance with WHO recommendations. The independence of the IEC from the sponsor, investigator, and CRO was verified through a review of the committee membership list. …
10. Monitoring
Original · WHOPIR
The study was monitored by an external monitor employed by the sponsor. Pre-study, in-study, and post-study monitoring visits were conducted. The monitor prepared a written report after each site visit and communicated any issues to the CRO and the sponsor in a timely manner, including during the study when necessary, to allow prompt corrective action. The corresponding communications and corrective actions were documented. The monitor was appropriately qualified and ensured that the study was conducted in accordance with applicable requirements.
11. Investigators
Original · WHOPIR
The Principal Investigator was responsible for the clinical conduct of the study, including the clinical aspects of study design, administration of the investigational products, communication with local authorities and with the ethics committee, and signing the protocol as well as the final study report. The PI’s job description and curriculum vitae were reviewed.
12. Receiving, storage, and handling of investigational drug products
Original · WHOPIR
Information on the receipt, storage, handling, and accountability of investigational products at all stages of the trial was documented. Details related to shipment, delivery, receipt, description, storage (including storage conditions), dispensing, administration, and reconciliation of any remaining pharmaceutical products were verified. Information on the pharmaceutical products included dosage form, strength, batch number, and expiry date. Pharmaceutical products were stored under appropriate conditions in accordance with the specifications provided by the sponsor. …
13. Case report forms
Original · WHOPIR
Randomly selected CRFs from the study were reviewed using a risk-based approach. Verification focused on completeness, consistency, and accuracy of the recorded data against source documents, including laboratory reports and ECGs. Particular attention was given to critical data points, such as dosing times, inclusion/exclusion criteria, and safety- related information. Cross-checks were performed to ensure traceability and alignment with the trial protocol and applicable SOPs. The data to be collected for each volunteer were predefined in the study protocol. …
14. Volunteers, recruitment methods
Original · WHOPIR
A database maintained by JFDA (Participants in Clinical Trials Database) was used to prevent cross-participation and to ensure that a minimum interval of 80 days elapsed between a volunteer’s participation in one study and the next. Access to the database was password-protected and restricted to authorized study staff to ensure the confidentiality of volunteer information. Procedures for recruiting volunteers were defined in the applicable SOP and included a description of the methods used by the CRO. …
The study was planned, organized, conducted, and monitored to ensure an acceptable safety profile, including for the volunteers. A medical doctor was responsible for clinical decision-making in the event of adverse events and for notifying the relevant health authorities, the sponsor, and, where applicable, the ethics committee, particularly in cases of serious adverse events. First-aid equipment and appropriate emergency medication were available in the ICU and were ready for immediate use at the study site. …
16. Method development, Method validation & Analysis of study samples
Original · WHOPIR
Following method development, an analytical plan was prepared as the basis for method validation. A stable isotope-labelled internal standard was consistently used in the MS methods, and lithium heparin was used as the anticoagulant. During method validation (Validation of a High-Performance Liquid Chromatography– Tandem Mass Spectrometric Method for Determination of Pyrimethamine and Sulfadoxine in Lithium Heparinized Human Plasma), conducted in accordance with SOP for bioanalytical method validation, an analytical run was performed to evaluate batch performance with 153 samples comprising ca …
17. Sample collection, storage, and handling of biological material
Original · WHOPIR
The specifications of the samples (blood plasma), including sampling method, volume, and number of samples, were defined in the clinical trial protocol and in the information provided to the volunteers. Sample collection, preparation, transport/shipping, and storage were performed in accordance with SOP for biological sample collection and handling. Actual sampling times and any deviations from the predefined sampling schedule were recorded. These deviations were taken into account when calculating pharmacokinetic parameters. …
18. Data processing and documentation
Original · WHOPIR
Integration settings were scientifically justified and appropriate. The smoothing factor was maintained at a level that did not obscure potential interferences or alter peak geometry, i.e., less than 3. The algorithms and chromatographic parameters used for the study methods were verified, and the relevant SOP was reviewed. Acceptance and exclusion criteria for calibration curve standards and QC samples, as well as batch acceptance criteria, were defined in the applicable SOPs. …
19. Good laboratory practices
Original · WHOPIR
A tour of the facility was conducted on Day 4 to assess its suitability in terms of layout and safety. The general principles of Good Laboratory Practice were followed during the bioanalytical phase of BE studies, supported by an established and appropriate QA system. Deep freezers for sample storage and refrigerators for reference standards were adequately qualified, calibrated, and maintained. An alarm system linked to digital thermometers was in place to trigger SMS and call notifications to responsible personnel in case of excursions. This system was reviewed. …
20. Pharmacokinetic, statistical calculations
Original · WHOPIR
A detailed presentation was provided by the statisticians, covering the Pharmacometrics Unit (PMU) workflow, including randomization procedures, data management, pharmacokinetic and statistical analysis processes, and report generation. The presentation also addressed the use of validated software systems, quality control measures, and compliance with applicable SOPs, and included examples and clarifications in response to questions raised during the inspection. …
21. Study report
Original · WHOPIR
The process of study report preparation was verified during the inspection. Procedures were in place to ensure the quality and integrity of the study report. The study report included a section on the bioanalytical component of the trial, comprising a description of the bioanalytical method used and the corresponding method validation report. The Principal Investigator approved the clinical study report prior to data transfer to the statistical unit. Bioanalytical reports were also reviewed and approved by the responsible personnel and management. …
[WHO · WHO]Chongqing Huapont Shengchem — WHO public inspection report
Evidence BWHOSignal Med · T2WHO
WHO published a public inspection report (WHOPIR) covering its inspection of Chongqing Huapont Shengchem on 30 March 2026.
Inspection date
2026-03-30
Document no.
who-whopir-d42eb63e5970
Topic
Chongqing Huapont Shengchem
Issuing authority
WHO
Key facts · Basis: official index plus supporting sources
Site: Chongqing Huapont Shengchem
Inspection date: 30 March 2026
Publication: WHO public inspection report, carrying the conclusion and 15 summarised sections
Insight · Editorial insight
Publication of an international body's inspection of a site in China gives firms that cannot readily inspect there themselves a documented basis to work from. Anyone holding Chinese API suppliers should put the published WHOPIR list on a regular review cycle.
Check points
Regular check of whether a WHOPIR has been published for suppliers located in China
Criteria for using a published report as evidence in place of an onsite audit
Inspection report detail · From the source · WHO · Item 15
Inspection outcome
Original · WHOPIR
Based on the areas inspected, the people met and the documents reviewed, and considering the findings of the inspection, including the observations listed in the Inspection Report, Chongqing Huapont Shengchem Pharmaceutical Co., Ltd, Changshou Site, located at No.6, Huanan 1st Road, Yanjia Avenue, Changshou District, Chongqing, 401221, P.R. China was considered to be operating at an acceptable level of compliance with WHO GMP Guidelines. All the non-compliances observed during the inspection that were listed in the full report as well as those reflected in the WHOPIR, were addressed by the manufacturer, to a satisfactory level, prior to the publication of the WHOPIR. This WHOPIR will remain valid for three years, provided that the outcome of any inspection conducted during this period is positive.
1. Quality management
Original · WHOPIR
Quality Management system The documented system for quality assurance was established, with procedures covering key quality elements in place. The Quality Department was divided into QA and QC and was separate from the Production Department. Operations were specified in written form, and critical GMP requirements were essentially being met. An authorized person for the release of APIs was designated. Annual Product Quality Review The preparation of the APQRs was governed by the SOP “Annual Product Quality Review”. …
2. Personnel
Original · WHOPIR
An organization charts were available. The Changshou site has 207 employees at the time of inspection. The Quality department operated independently from Production department. The reporting lines and accountability were defined. The key personnel of the various departments had pharmaceutical qualifications and were experienced in pharmaceutical manufacturing. Job descriptions Staff members had defined roles and responsibilities, that were documented in job descriptions. The job descriptions of key personnel responsible for qulity and production were checked. …
3. Buildings and facilities
Original · WHOPIR
In general the facilities were located, designed and constructed to facilitate cleaning, maintenance and operations as appropriate to the type and stage of manufacture. Adequate space was provided for the orderly placement of equipment and materials. Manufacturing areas were of a good standard and suitable for the activities conducted therein. The classified areas were monitored for temperature, relative humidity and pressure differentials. …
4. Process equipment
Original · WHOPIR
Design and construction Generally, equipment was of appropriate design and adequate size and suitably located for its intended use, cleaning, sanitisation and maintenance. Equipment and permanently installed processing lines used during the production of an intermediate or API were appropriately identified. Equipment maintenance and cleaning Schedules and procedures were established for the preventive maintenance of equipment. The year 2026 annual Maintenance Program of the 06 workshop was available. …
5. Documentation and records
Original · WHOPIR
Documentation system The SOP “Management of numbering of Documents” was checked. Documents related to the manufacture of intermediates or APIs were prepared, reviewed, approved, and distributed according to respective SOPs. GMP documents were stored under the responsibility of the Quality Assurance (QA) department, with appropriate access restrictions in place. Documents were retained for defined periods following the SOP “Management of documentation” and the SOP “Management of Archives”. Batch numbering system The Product batch numbering system and code management were checked. …
6. Material management
Original · WHOPIR
Material management system Materials were managed by a hybrid system, both manually and in a computerised system. Materials were procured in accordance with agreed specifications from approved suppliers. Incoming materials were checked upon receipt, assigned with the approved vendor list, and stored in quarantine until they were approved after sampling and testing. Supplier management The SOP “Supplier management procedure” was checked. A vendor audit was performed following the requirements of SOP “Supplier quality audit management procedure”. …
7. Production and in-process controls
Original · WHOPIR
General The production workshops were not dedicated to Linezolid manufacturing. Linezolid API production in the chemical and clean area was in operation at the time of inspection. The relevant blocks were inspected. Raw materials were dispensed using appropriately accurate devices. The BMR of Linezolid in operation was checked and considered to be acceptable. Different quality grades of Linezolid API were produced with the same manufacturing process for different markets/customers. A computerised system was used for process formulation and parameter control. …
8. Packaging and identification labelling of APIs and intermediates
Original · WHOPIR
Packaging and labelling were not in operation in the clean area during the WHO inspection. The BPRs of Linezolid batches were reviewed and discussed.
9. Storage and distribution
Original · WHOPIR
Warehousing procedures Adequate facilities were available for the storage of materials under appropriate conditions. Records of these conditions were maintained. Distribution procedures APIs were released for distribution to third parties only after approval by the QP or their delegates. WHO grade Linezolid API batches had not been distributed for marketing.
10. Laboratory controls
Original · WHOPIR
The QC Laboratories The QC department was divided into the instrumental analysis group and the physicochemical testing group. The microbiology testing at the site was restricted to environmental monitoring and water samples. The samples for product-related microbiology testing were sent to the QC department at the another site of the company. …
11. Validation
Original · WHOPIR
VMP The approved VMP for 2026 was available and reviewed. The company qualification and validation policy and programme were defined and documented. The annual VMP was generated, including the schedule for the current year and monitoring its completion date and report. Process Validation The SOP “Production department process validation management procedure” was reviewed. According to the validation master plan and the validation policy, the process validation followed the lifecycle-based approach, including process design, process qualification and continued process verification. …
12. Change control
Original · WHOPIR
The SOP “Change Management” was available. Changes were categorized as major, moderate or minor based on impact. Changes related to the WHO Linezolid API were checked during the inspection.
13. Rejection and re-use of materials
Original · WHOPIR
Rejection The rejected products of starting materials, packaging material, intermediates and APIs were handled following SOP “Non-compliance material management”. Rejected intermediates and final products could be reprocessed after approval by the quality head following SOP “Production department handling procedure of non- compliance materials”. The rejection registers were maintained. Reprocessing and reworking According to the SMF, the rework was not allowed. …
14. Complaints and recalls
Original · WHOPIR
Complaints Complaints were classified into two categories: quality and non-quality complaints. Quality-related complaints were recorded, investigated and managed by QA following written procedures. Records of complaints were retained in a paper logbook. An investigation report was required to be sent to the customer when the investigation was finished and the complaint was closed within defined timelines. The quality complaint recorded was checked and discussed. Recalls The common product recall and return procedure was available. …
Production operations were not contracted out for the product related to the WHO prequalification programme. Routine tests of Linezolid were not contracted out, except for the microbiological test thath was performed in the QC laboratory at the another site of the company.
[WHO · WHO]MSN Labs (Rudraram) — WHO public inspection report
Evidence BWHOSignal Med · T2WHO
WHO published a public inspection report (WHOPIR) covering its inspection of MSN Labs (Rudraram) on 17 March 2026.
Inspection date
2026-03-17
Document no.
who-whopir-2f9a22220aa8
Topic
MSN Labs (Rudraram)
Issuing authority
WHO
Key facts · Basis: official index plus supporting sources
Site: MSN Labs (Rudraram)
Inspection date: 17 March 2026
Publication: WHO public inspection report, carrying the conclusion and 15 summarised sections
Insight · Editorial insight
Several months separate the inspection from publication, so what is published may not describe the site as it stands today. Products using material from this company should confirm separately with the supplier whether the findings in the report have been closed out.
Check points
Confirm with the supplier whether the findings in the report have been closed
Set the supplier assessment cycle allowing for the lag between inspection and publication
Inspection report detail · From the source · WHO · Item 15
Inspection outcome
Original · WHOPIR
Based on the areas inspected, the people met and the documents reviewed, and considering the findings of the inspection, including the observations listed in the Inspection Report xxx, located at MSN Laboratories Private Limited, located at Sy. No. 317, 320, 321, 322, 323, 604 & 605, Rudraram (Village), Patancheru (Mandal), Sangareddy District, Telangana, Pincode: 502 329; India, was considered to be operating at an acceptable level of compliance with WHO good manufacturing practices for active pharmaceutical ingredients guidelines. The deficiencies observed during the inspection, as listed in the full report, were addressed by the manufacturing site to a satisfactory level before the publication of the WHOPIR. This WHOPIR will remain valid for 3 years, provided that the outcome of any inspection conducted during this period is positive
1. Quality management
Original · WHOPIR
A detailed presentation of MSN Laboratories Private Limited was provided, outlining its establishment in 2003 and its subsequent expansion into a multi-unit pharmaceutical group with facilities across India. The company specialized in the manufacture of APIs and formulations, supported by dedicated R&D, QC, and regulatory functions. Its operations were governed by established quality management systems aligned with international standards, including WHO GMP, US FDA, and EU GMP. …
2. Personnel
Original · WHOPIR
Personnel qualification An adequate number of personnel, qualified by appropriate education, training, and/or experience, were available to perform and supervise the manufacture of intermediates and APIs. The responsibilities of personnel engaged in the manufacture of intermediates and APIs were defined in their respective job descriptions, which were reviewed on a sampling basis. Training was regularly conducted by qualified individuals and covered, at a minimum, the specific operations performed by the employee. …
3. Buildings and facilities
Original · WHOPIR
Design and construction Buildings and facilities used in the manufacture of intermediates and APIs were generally located, designed, and constructed to facilitate cleaning, maintenance, and operations appropriate to the type and stage of manufacture. Facilities were designed to minimize the risk of contamination. In areas classified as ISO 8, facilities were also designed and monitored to limit exposure to objectionable microbiological contaminants, as appropriate. …
4. Process equipment
Original · WHOPIR
Design and construction Equipment used in the manufacture of intermediates and APIs was of appropriate design, adequate size, and suitably located to facilitate its intended use, cleaning, sanitization (where appropriate), and maintenance. Equipment was constructed so that surfaces in contact with raw materials, intermediates, or APIs did not adversely affect product quality beyond established specifications. Production equipment was inspected during the inspection to verify that it was operated within its qualified operating ranges and conditions. …
5. Documentation and records
Original · WHOPIR
Original documents were prepared on A4-size white paper and, following approval, were retained by QA. Controlled copies were issued to user departments as photocopies of the original, with “QA CONTROLLED COPY” stamped on all pages. Document changes were managed through the change control system and identified by version number. Superseded documents were retrieved and destroyed, except for executed documents. Original copies were retrieved and stamped as “OBSOLETE COPY” on all pages. Document control activities were performed in accordance with the applicable SOP. …
6. Materials management
Original · WHOPIR
The warehouse was designed to ensure a unidirectional flow of materials, from receipt of starting materials to dispatch of finished products. The warehouse included defined areas for receipt, identification, quarantine, storage, handling, sampling, dispensing, and rejection of materials. Receipt and inspection of raw and packing materials were performed in accordance with the applicable SOPs. Storage and handling of raw and packing materials were carried out in accordance with the respective SOP. A system was established for the evaluation of suppliers of critical materials. …
7. Production and in-process controls
Original · WHOPIR
The production process comprised two stages: intermediate stage (MOP1) and final stage (MOP2). In Stage 1 (MOP1), the key starting material Cytidine was used. Manufacturing activities were performed in Blocks N, P, S, and R. In Stage 2 (MOP2), MOP1 was used as input. Operations were carried out in the V Block intermediate area and Clean Room II. No batches had been manufactured since 2022. The manufacturing process involved controlled reaction steps under a Nitrogen atmosphere in glass- lined reactors, with monitoring of reaction progress by TLC. …
8. Packaging and identification labelling of APIs and intermediates
Original · WHOPIR
General: An SOP was established, describing the receipt, identification, quarantine, sampling, examination and/or testing, release, and handling of packaging and labelling materials. Packaging and labelling materials conformed to established specifications. Materials not meeting these specifications were rejected to prevent their use in operations for which they were unsuitable. Labels were stored under lock and key in the QC laboratory. …
9. Storage and distribution of API
Original · WHOPIR
APIs were released for distribution to third parties only after approval by the Quality Unit. Intermediates were transferred under quarantine to other units under the company’s control when authorized by the Quality Unit. Appropriate controls and documentation were in place. SOP for solvent tanker receipt, inspection, storage, and handling (effective 15 June 2024) was available and was reviewed. Solvents used for MOP1 and MOP2 included methanol, toluene, acetone, methyl tert-butyl ether (in drums), dichloromethane, and IPA. Solvents were delivered by tanker to the tank yard. …
10. Laboratory controls
Original · WHOPIR
The independent Quality Unit had adequate laboratory facilities. Written procedures, including SOP for sampling and handling, covered sampling, testing, approval or rejection of materials, and storage of laboratory data. Laboratory records were maintained in accordance with established requirements. The analytical raw data issue and checklist for a selected batch were reviewed. The batch was tested on 8 Mar 2022, and the analysis was completed on 22 Mar 2022. …
11. Validation
Original · WHOPIR
Validation documentation The Validation Master Plan described the company’s approach and intentions regarding validation activities. Validation was performed for all relevant activities in accordance with the defined Validation Policy and SOP (Master Validation Plan). Revalidation, where required, was performed in accordance with the current version of the Validation Master Plan and the Process Validation SOP. …
12. Change control
Original · WHOPIR
A formal change control system was established through the respective SOP to evaluate all changes that could impact the production and control of APIs, as well as related SOPs and computerized systems. The SOP defines the process for identification, documentation, review, and approval of such changes. Selected change control requests were randomly selected and reviewed. Separate register logbooks were maintained for each product. The register for Molnupiravir for the years 2025 and 2026 was available and was reviewed. …
13. Rejection and re-use of materials
Original · WHOPIR
Rejection APIs that did not meet established specifications were identified and placed under quarantine. Reprocessing and reworking SOP for reprocessing and reworking (effective 1 June 2023) was available and was reviewed. The SOP defined requirements for reprocessing and reworking of intermediates and APIs that did not conform to established specifications and was applicable to MOP1 and MOP2. Reprocessing and reworking were clearly defined in the SOP. Where reprocessing was performed, the resulting batch was required to be included in both accelerated and long-term stability studies. …
14. Complaints and recalls
Original · WHOPIR
Complaints SOP for Market Complaint Management (effective 1 June 2023) was available and was reviewed. The SOP defined procedures to ensure that complaints were recorded, investigated, and reviewed within defined timelines to prevent recurrence. Complaints were classified as Critical, Major, or Minor, with definitions provided. Responsibilities of the respective departments and timelines for each stage of complaint handling were defined. Preliminary investigation timelines were established as 7 days for critical complaints and 15 days for major and minor complaints. …
The qualification of contractors, manufacturers of APIs, and other critical material suppliers, as well as the use of external scientific, analytical, or technical services, was defined in the current version of Supplier Qualification. The company utilized external laboratories for activities not available in-house. A list of contractors was available and discussed. Contract manufacturers were evaluated by Corporate QA to ensure GMP compliance for the specific operations performed at the contract sites. …
[GMP inspection · MFDS]제주대학교병원 — Equipment time control and audit trail gaps
Evidence AMFDSSignal High · T3GMP inspection
The Ministry of Food and Drug Safety published the result of a post-approval GMP inspection carried out from 10 to 11 February 2026, which raised deficiencies in the facilities and equipment area.
Published
2026-08-18
Document no.
gmpinspect-1Q0I8CiIr0X
Site
제주대학교병원
Inspection period
2026-02-10~2026-02-11
Original text
평가 결과 지적(보완)사항(Deficiencies) 분야1) 구분2) 근거 법령 지적(보완)사항 요약 비고3) 시설장비 기타 [별표 1] 제2.1호 아목 제조 및 시험 설비 시간 관리 절차 미흡 보완 완료 기타 [별표 1] 제2.2호 나목 Audit Trail과 사용 대장의 일치 확인을 위한 세부 실행 절차 미흡 보완 완료 기타 [별표 1] 제2.
Key facts · Basis: official source record kept by the collector
Deficiency: inadequate procedure for time control on manufacturing and testing equipment (Annex 1, clause 2.1) - resolved
Deficiency: inadequate detailed procedure for confirming that the audit trail agrees with the equipment usage log (Annex 1, clause 2.2) - resolved
Deficiency: standards for clean area control and for environmental and personnel monitoring were not kept current (Annex 1, clause 2.3) - resolved
Category: post-approval, finished product (single), inspected 10 to 11 February 2026
Insight · Editorial insight
Basic data integrity items such as equipment clock control and reconciliation against the audit trail keep recurring in domestic post-approval inspections. Finished product sites, including those attached to a healthcare institution, should set out clock synchronisation for equipment and the reconciliation cycle for usage logs in a procedure.
Check points
Clock synchronisation and change control procedure for manufacturing and testing equipment
Frequency of audit trail review and reconciliation against equipment usage logs
Whether standards for clean area environmental and personnel monitoring are current
[GMP inspection · MFDS](주)카이바이오텍 — OS-level access rights not controlled
Evidence AMFDSSignal High · T3GMP inspection
The Ministry of Food and Drug Safety published the result of a post-approval GMP inspection carried out from 9 to 11 March 2026, which raised deficiencies in the facilities and equipment area and in personnel hygiene.
Published
2026-08-18
Document no.
gmpinspect-1Q0I8CiIsRn
Site
(주)카이바이오텍
Inspection period
2026-03-09~2026-03-11
Original text
평가 결과 지적(보완)사항(Deficiencies) 분야1) 구분2) 근거 법령 지적(보완)사항 요약 비고3) 시설장비 기타 [별표 1] 제2.1호 아목 GC 사용 가스 식별 라벨 관리 미흡 보완 완료 기타 [별표 1] 제2.2호 나목 컴퓨터 시스템 OS 접근 권한 관리 미흡 보완 완료 기타 [별표 1] 제2.3호 가목 청정구역 관리 기준 및 환경·작업원 모니터링 관련 기준서의 현행화 미흡 보완 완료 기타 [별표 1] 제9.
Key facts · Basis: official source record kept by the collector
Deficiency: inadequate control of operating system access rights on computerised systems (Annex 1, clause 2.2) - resolved
Deficiency: inadequate control of identification labels on gases used with the gas chromatograph (Annex 1, clause 2.1) - resolved
Deficiency: inadequate standards for gowning and inadequate laundering procedure (Annex 1, clause 9.1) - resolved
Category: post-approval, finished product (single), inspected 9 to 11 March 2026
Insight · Editorial insight
Controlling rights inside the application while leaving operating system level access uncontrolled is what produced the data integrity finding here. Sites should confirm who holds administrator rights on the computers connected to laboratory instruments and whether the use of those rights is tracked.
Check points
List of holders of operating system administrator rights on systems connected to laboratory instruments
Control of identification marking on consumables such as laboratory gases
Documentation of gowning standards and of the outsourced laundering procedure
[GMP inspection · MFDS]나주신일가스주식회사 — No GMP committee meetings, no SOP review
Evidence AMFDSSignal Med · T2GMP inspection
The Ministry of Food and Drug Safety published the result of a post-approval GMP inspection carried out from 15 to 16 December 2025, which raised major deficiencies in the quality area.
Published
2026-08-18
Document no.
gmpinspect-1Q0I8CiIUNN
Site
나주신일가스주식회사
Inspection period
2025-12-15~2025-12-16
Original text
평가 결과 지적(보완)사항(Deficiencies) 분야1) 구분2) 근거 법령 지적(보완)사항 요약 비고3) 품질 중요 [별표 1] 제3.4호 GMP 위원회 정기회의 및 기록 관리 미실시 보완 완료 중요 [별표 1] 제5.1호 마목 기준서 및 SOP 정기점검 미실시 보완 완료 기타 [별표 1] 제1의2호 데이터 완전성 전담 조직의 독립성 결여 및 전담 조직 구성 미흡 보완 완료 기타 [별표 1] 제3.
Key facts · Basis: official source record kept by the collector
Major deficiency: regular GMP committee meetings were not held and the records were not managed (Annex 1, clause 3.4) - resolved
Major deficiency: periodic review of standards and SOPs was not carried out (Annex 1, clause 5.1) - resolved
Deficiency: the unit dedicated to data integrity lacked independence and was inadequately constituted (Annex 1) - resolved
Deficiency: no deputy was appointed for duties the head of production may not delegate (Annex 1, clause 3.2) - resolved
Insight · Editorial insight
When the GMP committee meetings and the periodic review of standards that evidence how the quality system runs are missing, the finding reaches major grade even where the documentation framework exists. Sites should confirm that management review minutes and the periodic review history for standards are on file at the required frequency.
Check points
Whether regular GMP committee meetings are held and minutes retained
Records showing the periodic review cycle for standards and SOPs is met
Whether the unit responsible for data integrity is independent
[Recall / sales suspension · MFDS](주)다림바이오텍 레파넘정2밀리그람(레파글리니드) 외 2품목 — Nitrosamine impurity above the limit
Evidence AMFDSSignal High · T3💊 Small moleculeRecall
A voluntary recall of product already in distribution was started for repaglinide preparations after the impurity N-nitroso-melumine was detected above the limit.
Published
2026-08-19
Document no.
recall-6f749819c418
Companies
(주)다림바이오텍
Product
레파넘정2밀리그람(레파글리니드) 외 2품목
All 3 products
레파넘정2밀리그람(레파글리니드)
레파넘정0.5밀리그램(레파글리니드)
레파넘정1밀리그램(레파글리니드)
Original text · representative case
불순물(N-nitroso-melumine) 초과 검출에 따른 시중 유통품에 대한 영업자 회수
Key facts · Basis: official source record kept by the collector
Reason: the impurity N-nitroso-melumine was detected above the limit
Scope: three products recalled together for the same reason, covering product already in distribution
Date: recall order dated 19 August 2026, not mandated
Insight · Editorial insight
Control of nitrosamine impurities is extending past the sartan and ranitidine families to oral antidiabetics such as repaglinide. Firms should confirm that the list of products in scope for nitrosamine risk assessment is being updated to reflect the newest detection cases.
Check points
Whether the list of products in scope for nitrosamine risk assessment is current
Test method and control limit set for nitroso impurities in active ingredient and finished product
Status of the confirmatory testing required by the risk assessment outcome
A voluntary recall was started for a sterile gauze product after foreign matter was found in it.
Published
2026-08-19
Document no.
recall-81a336d762e4
Companies
수성위생재료공업사
Product
수성멸균거즈-엔
Original text
이물질 혼입에 따른 영업자 회수
Key facts · Basis: official source record kept by the collector
Reason: foreign matter contamination
Product: a sterilised gauze product
Date: recall order dated 19 August 2026, not mandated
Insight · Editorial insight
Foreign matter usually enters through a route created in the manufacturing environment or the packaging step, so final visual inspection alone does not catch it. Firms handling sterile products should confirm that the review of foreign matter entry routes extends through to packaging.
Check points
Records of inspection of foreign matter entry routes within the packaging process
Visual inspection criteria for sterile products and defined examples of a reject
A voluntary recall was started for a palonosetron hydrochloride injection after the assay result in post-market stability testing failed to meet specification.
Published
2026-08-19
Document no.
recall-b8b6f96d9b57
Companies
하나제약(주)
Product
파록시주(팔로노세트론염산염)
Original text
시판 후 안정성시험 함량시험 결과 부적합에 따른 영업자 회수
Key facts · Basis: official source record kept by the collector
Reason: the assay result in post-market stability testing did not meet specification
Product: palonosetron hydrochloride injection
Date: recall order dated 19 August 2026, not mandated
Insight · Editorial insight
An assay failure arising in post-market stability testing puts the basis on which the shelf life was set back under examination. Firms should confirm they have criteria for reviewing early when the assay trend at intermediate stability timepoints is drifting downwards.
Check points
Criteria for deciding on a recall when post-market stability testing fails
Review of assay trends across stability timepoints and the criteria for a trend excursion
[Recall (Health Canada) · Health Canada]B. Braun Medical Inc. — Particulate matter in an infusion solution
Evidence AHealth CanadaSignal High · T3Recall
Health Canada published recall information for Lactated Ringer's Injection USP from B. Braun Medical Inc. after particulate matter was found in the product.
Published
2026-08-17
Document no.
hc-82497
Companies
B. Braun Medical Inc.
Product
Lactated Ringer's Injection USP
Class
Type I
Original text and translation
Product quality
Key facts · Basis: official source record kept by the collector
Class: Type I
Reason: product quality - presence of particulate matter
Product: Lactated Ringer's Injection USP (B. Braun Medical Inc.), solution
Advice: verify whether product on hand is affected and consult a healthcare provider before discontinuing use
Insight · Editorial insight
Particulate matter in a large volume infusion is classed at the highest risk level because of how it is administered, and this case was handled as Type I. Infusion solution sites should confirm that the acceptance criteria and sample size for particulate inspection of large volume containers are set in proportion to that risk.
Check points
Acceptance criteria and sampling design for visual particulate inspection of large volume parenterals
Review of particulate entry routes from the container and closure of infusion solutions
Recall detail · From the source · Health Canada
Active ingredient · Calcium Chloride 20mg/100ml; Potassium Chloride 30mg/10ml; Sodium Chloride 600mg/100ml; Sodium Lactate 310mg/100mlDosage form · Solution
What you should do
Original · Health Canada
Verify if your product is affected.Consult your healthcare provider prior to discontinuing use of the affected product, or for any health concerns.Contact the recalling firm if you have any questions about the recall.Report any health product related side effects to Health Canada.Report any other health product safety complaints to Health Canada.
[Recall · FDA]Sunny Pharmtech Inc. — Stainless steel particulate in an injection
Evidence AFDASignal High · T3Recall
Particulate matter identified as stainless steel was found in Cyclophosphamide for Injection, USP manufactured by Sunny Pharmtech Inc., and FDA classified the recall as Class I.
Published
2026-08-12
Document no.
D-0743-2026
Companies
Sunny Pharmtech Inc.
Product
Cyclophosphamide for Injection, USP, 1 gram/vial, One Single-Dose Vial, Rx only, Manufactured for: Long Grove Pharmaceuticals, LLC, Rosemont, IL 60018. Manufactured in Taiwan, NDC 81298-8112-1 외 1품목
Class
Class I
All 2 products
Cyclophosphamide for Injection, USP, 1 gram/vial, One Single-Dose Vial, Rx only, Manufactured for: Long Grove Pharmaceuticals, LLC, Rosemont, IL 60018. Manufactured in Taiwan, NDC 81298-8112-1
Cyclophosphamide for Injection, USP, 2 gram/vial, One Single-Dose Vial, Rx only, Manufactured for: Long Grove Pharmaceuticals, LLC, Rosemont, IL 60018. Manufactured in Taiwan, NDC 81298-8114-1
Original text and translation · representative case
Presence of Particulate Matter; identified as stainless steel
Key facts · Basis: official source record kept by the collector
Class: Class I
Reason: presence of particulate matter, identified as stainless steel
Scope: two products recalled together for the same reason
Firm: Sunny Pharmtech Inc., manufactured in Taiwan for Long Grove Pharmaceuticals, LLC
Insight · Editorial insight
Metal particulate confirmed in an injection also calls for an investigation into process-derived causes such as equipment wear or a detached part. Sterile injectable sites should confirm the inspection cycle for wear on metal contact parts of filling equipment, and that the finished product visual inspection criteria are designed to detect metal particulate.
Check points
Inspection frequency for wear and detachment of metal contact parts on injectable manufacturing lines
Risk assessment of foreign matter entry points in the filling process
Defect classification criteria for particulate in visual inspection of sterile injectables
Recall detail · From the source · OpenFDA · Based on the representative product
This card groups 2 products into one entry. All values below refer to one representative product (including lots, quantity, and status).
Status · OngoingVoluntary: Firm initiatedFirst notified · Letter
Status
Recall initiated · 2026-07-17FDA classification · 2026-08-07FDA published · 2026-08-12
Affected lots and expiry
Original · OpenFDA
Lot # C23019V1, Exp 10/31/2026; C24015V1, Exp 4/30/2027
[Recall · FDA]Zydus Pharmaceuticals (USA) Inc — Nitrosamine impurity out of specification
Evidence AFDASignal High · T3💊 Small moleculeRecall
An out-of-specification result for the N-Nitroso Mirabegron impurity was found in Mirabegron Extended-Release Tablets distributed by Zydus Pharmaceuticals (USA) Inc, and a recall followed.
CGMP: Due to Out of Specification (OOS) result for N-Nitroso Mirabegron impurity.
Key facts · Basis: official source record kept by the collector
Class: Class II
Reason: CGMP - out-of-specification result for the N-Nitroso Mirabegron impurity
Product: Mirabegron Extended-Release Tablets, 25 mg, manufactured in India by Zydus Lifesciences Ltd.
Issued: 12 August 2026
Insight · Editorial insight
A recall over excess nitroso impurity also arose domestically in the same week, showing that nitrosamine control is not confined to one group of active ingredients. Firms holding extended-release products should confirm whether the effect of the dosage form and the excipient combination on nitroso formation risk has been carried into the risk assessment.
Check points
Whether nitroso impurity formation risk by dosage form, including extended release, is reflected in the risk assessment
Testing frequency and control limits for nitroso impurities at finished product stage
Arrangements for receiving impurity test results for products manufactured overseas under contract
Recall detail · From the source · OpenFDA
Status · OngoingVoluntary: Firm initiatedFirst notified · Letter
Status
Recall initiated · 2026-08-05FDA classification · 2026-08-07FDA published · 2026-08-12
Affected lots and expiry
Original · OpenFDA
Lot # E408618, Expiry: 11/30/2026, NDC #: 70710-1159-3
[Recall (UK) · MHRA]Class 2 Medicines Recall: Zentiva Pharma UK Limited, Fingoli… — Recall over possible metal particles
Evidence AMHRASignal Med · T2💊 Small moleculeRecall
MHRA issued recall notice EL(26)A/37 covering one batch of Fingolimod Zentiva 0.5 mg Capsules from Zentiva Pharma UK Limited.
Published
2026-08-20
Document no.
316a12843e67
Companies
Zentiva Pharma UK Limited
Original text and translation
Zentiva UK Pharma Limited are recalling one batch of Fingolimod Zentiva 0.5 mg Capsules (BN 4L01372H) as a precautionary measure due to a potential risk of contamination with metal particles.
Key facts · Basis: official source record kept by the collector
Reason: precautionary measure because of a potential risk of contamination with metal particles
Scope: one batch of Fingolimod Zentiva 0.5 mg Capsules (BN 4L01372H)
Notice: EL(26)A/37, 20 August 2026
Insight · Editorial insight
Choosing a batch-level recall at the stage of a potential rather than a confirmed contamination shows the threshold for precautionary action moving lower. Firms should confirm they hold the traceability data that would let them narrow a recall to batch level if a possibility of metal particulate were raised.
Check points
Operation and verification status of metal detection on solid dosage manufacturing lines
Records of periodic inspection of wear parts on tablet and capsule filling equipment
Recall detail · From the source · MHRA
Full alert (Drug Alert)
Original · MHRA
DMRC reference number DMRC - 39754868 Marketing Authorisation Holder Zentiva Pharma UK Limited Medicine Details Fingolimod Zentiva 0.5 mg Capsules PL: 17780/0858 Active Ingredient: Fingolimod SNOMED code: 40459211000001106 GTIN: 8594739260931 Affected Lot Batch Numbers Batch No. Expiry Date Pack Size First Distributed 4L01372H 11/2027 28 28 January 2025 Background Zentiva UK Pharma Limited are recalling one batch of Fingolimod Zentiva 0.5 mg Capsules (BN 4L01372H) as a precautionary measure due to a potential risk of contamination with metal particles. The particles, if present, are known to be small and pose a low risk to the safety or efficacy of the tablets. No reports have been received to date, the particles were identified during shelf-life testing. Advice for Healthcare Professionals: Stop supplying the affected batch. Quarantine all remaining stock and return it to your supplier using your supplier’s approved process. Advice for Patients: If patients have the affected batch they should contact their pharmacy in the first instance. Do not stop taking your medication without speaking to your healthcare professional first. The particles, if present, are known to be small and pose a low risk to the safety of the product. Patients with this batch are not considered at risk and no reports of harm have been reported for this batch of capsules. Patients who experience adverse reactions or have any questions about the medication should seek medical attention. Any suspected adverse reactions should also be reported via the MHRA Yellow Card scheme. Additional information: For all medical information enquiries and information on this product, please email [email protected] , or telephone 0800 090 2408. For stock control enquiries please email [email protected] , or telephone 01371 822022. Recipients of this Medicines Recall should bring it to the attention of relevant contacts by copy of this notice. NHS regional teams are asked to forward this to community pharmacists and dispensing general practitioners for information. Yours faithfully Defective Medicines Report Centre 10 South Colonnade Canary Wharf London E14 4PU Telephone +44 (0)20 3080 6574 [email protected] Download document Class 2 Medicines Recall: Zentiva Pharma UK Limited, Fingolimod Zentiva 0.5 mg Capsules, EL(26)A/37
[Recall (Health Canada) · Health Canada]Omega Laboratories Limited — Degradant may fall outside specification
Evidence AHealth CanadaSignal Med · T2Recall
Health Canada published recall information for CISATRACURIUM BESYLATE INJECTION USP MULTIDOSE from Omega Laboratories Limited because the degradation product benzaldehyde may fall outside specification.
Published
2026-08-19
Document no.
hc-82501
Companies
Omega Laboratories Limited
Product
CISATRACURIUM BESYLATE INJECTION USP MULTIDOSE
Class
Type III
Original text and translation
Product quality
Key facts · Basis: official source record kept by the collector
Class: Type III
Reason: product quality - the degradation product benzaldehyde may fall outside specification in the affected lots
Advice: verify whether product on hand is affected and consult a healthcare provider before discontinuing use
Insight · Editorial insight
A multidose injection carries more room for a degradation product to move outside specification because the in-use period after first opening counts too, which makes the design of the stability test panel decisive. Firms should confirm that degradation product specifications for multidose products were set against real in-use conditions.
Check points
Basis for the degradation product specification and the test panel for multidose injections
Records of trend monitoring of degradation products through the shelf life
Recall detail · From the source · Health Canada
Active ingredient · Cisatracurium (Cisatracurium besilate) 2 mg/mLDosage form · Solution
What you should do
Original · Health Canada
Verify if your product is affected.Consult your healthcare provider prior to discontinuing use of the affected product(s), or for any health concerns.Contact the recalling firm if you have any questions about the recall.Report any health product related side effects to Health Canada.Report any other health product safety complaints to Health Canada.
[Recall · FDA]Aurobindo Pharma USA Inc — Shortfill and empty capsules recalled
Evidence AFDASignal Med · T2💊 Small moleculeRecall
Reports of shortfill and empty capsules were received for Dicyclomine Hydrochloride Capsules, USP 10mg distributed by Aurobindo Pharma USA Inc, and a recall followed.
Key facts · Basis: official source record kept by the collector
Class: Class II
Reason: shortfill and reports of empty capsules
Product: Dicyclomine Hydrochloride Capsules, USP, 10mg, 1,000 count bottles, manufactured in India
Issued: 12 August 2026
Insight · Editorial insight
Empty capsules and shortfill together read as a failure caught neither by in-process weight control nor by final inspection. Capsule sites should confirm the limits of their in-process weight variation control and that the detection performance of the finished product weight sorter has been verified.
Check points
Weight variation control limits and monitoring frequency in the capsule filling process
Verification records for the detection performance of the finished product weight sorter
Recall detail · From the source · OpenFDA
Status · OngoingVoluntary: Firm initiatedFirst notified · Letter
Status
Recall initiated · 2026-07-23FDA classification · 2026-08-04FDA published · 2026-08-12
Affected lots and expiry
Original · OpenFDA
Batch # DMC125018A, Exp Date: 07/2027.
Recall size and scope
Quantity — 6,408 bottles distributed to market
Distribution — US Nationwide.
Company location — East Windsor, NJ, United States
Every Monday we email the week's new inspection records from the FDA, EMA, Health Canada and MFDS, with a short summary of the week's regulatory news. We'll also let you know when the site gains new features. Unsubscribe any time with one click.
Sent every Monday · a confirmation email follows when you subscribe · unsubscribe from the footer of any email.
Confirmation email sent
Click the confirmation button in the email. It's sent from GRM Solutions Brief. If you don't see it, check your spam folder.
AI Disclosure
How this content is produced, and caveats
1. Information generated by AI
Card titles, summaries, Korean translations, implications, check items, and detailed analysis are content generated automatically by generative AI from published primary official material.
2. Information provided as in the source
Figures, codes, dates, agency and company names in the fact table, quotations from the original text, source and official-document links, and findings tables (FDA Form 483 observations, MFDS routine inspection findings, and so on) are extracted mechanically from the source and are not reworded or rewritten.
3. Verification, limitations, and user notes
To improve accuracy, GRM provides evidence grades (A, B, C) and signal tiers (1–3). Evidence A means the information can be checked directly against a primary official document.
Summaries, translations, implications, check items, and detailed analysis generated by generative AI may contain mistranslations, omissions, misread context, or information that is not up to date.
This service is reference material intended to provide regulatory and quality information; it does not provide legal, regulatory, quality, or compliance advice or official interpretation.
Before using this material for decisions, quality system operation, regulatory response, or audit preparation, users must check the official source and the relevant agency's latest material themselves.
This digest is AI-generated from primary sources; interpretations are not official or legal advice — verify against the original before acting.