EU · EudraLex Vol.4
EU GMP Annex 1 8.61
8. Production and Specific Technologies › Moist heat sterilisation
Section text
There should be adequate assurance of air removal prior to and during sterilisation when the sterilisation process includes air purging (e.g. porous autoclave loads, lyophilizer chambers). For autoclaves, this should include an air removal test cycle (normally performed on a daily basis) or the use of an air detector system. Loads to be sterilised should be designed to support effective air removal and be free draining to prevent the build-up of condensate.
Source: European Commission, DG SANTE · © European Union. Reuse is authorised provided the source is acknowledged (Commission Decision 2011/833/EU on the reuse of Commission documents). · retrieved 2026-11-15