ICH Q7 6.52
6. DOCUMENTATION AND RECORDS
Section text
Documentation of completion of each significant step in the batch production records (batch production and control records) should include:
- Dates and, when appropriate, times;
- Identity of major equipment (e.g., reactors, driers, mills, etc.) used;
- Specific identification of each batch, including weights, measures, and batch numbers of raw materials, intermediates, or any reprocessed materials used during manufacturing;
- Actual results recorded for critical process parameters;
- Any sampling performed;
- Signatures of the persons performing and directly supervising or checking each critical step in the operation;
- In-process and laboratory test results;
- Actual yield at appropriate phases or times;
- Description of packaging and label for intermediate or API;
- Representative label of API or intermediate if made commercially available;
- Any deviation noted, its evaluation, investigation conducted (if appropriate) or reference to that investigation if stored separately; and
- Results of release testing.
Source: International Council for Harmonisation (ICH) · © ICH. Per the legal notice in each guideline, the document may be used, reproduced and distributed provided ICH's copyright is acknowledged; any adaptation or translation must be labelled as such and must not imply ICH endorsement. · retrieved 2026-11-15