Procedures for the acceptance and control of in-process product have not been established.
Inspection Record
DiAgam Societe Anonyme (S.A.) — FDA 483 Findings
Inspectors Naakesh N GomanieThe inspectors who signed the published document.Inspector lookup
View the regulator's official source The source document is always the basis for judgement.
Findings
Procedures for finished device acceptance have not been adequately established.
The appropriate design, construction, placement, and installation ofmanufacturing equipment have not been ensured and equipment used in the manufacturing process does not meet specified requirements.
A process whose results cannot be fully verified by subsequent inspection and test has not been adequately validated according to established procedures.
Similar findings at other companies
GRM selected findings from the same type of public document whose wording is close to a finding in this document. One per company.
- Bio-Rad Medical Diagnostics GmbH2024-06-14 · US FDASimilar to finding 4 A process whose results cannot be fully verified by subsequent inspection and test has not been adequately validated according to established procedures.
- FRUEH VERPACKUNGSTECHNIK AG2023-03-24 · US FDASimilar to finding 4 A process whose results cannot be fully verified by subsequent inspection and test has not been adequately validated.
- H & P Industries, Inc.2015-07-11 · US FDASimilar to finding 4 A process whose results cannot be fully verified by subsequent inspection and test has not been adequately validated according to established procedures.
A record as of the US FDA document published on 2026-10-26. Check the agency's announcements for any later corrective action, and rely on the original text. Translation and classification are machine-made.