The quality control department did not undertake all of the required activities. Senior management's ability to determine and/or provide adequate and/or appropriate resources to implement, maintain and/or improve the effectiveness of the quality management system was inadequate.
Inspection Record
Kohl & Frisch Limited — Health Canada Inspection Findings
View the regulator's official source The source document is always the basis for judgement.
Findings
The implementation of a self-inspection program was inadequate.
The controls were inadequate for creating, modifying, reviewing, storing, and/or retrieving records.
The assessment, documentation, and/or procedures for considering the resale of returned drugs were inadequate.
The change control system was inadequate for ensuring changes are properly documented, evaluated, and/or approved.
The guidelines and/or procedures were inadequate in ensuring storage and/or transportation conditions would maintain the quality and safe distribution of the drug.
Investigations into deviations, reports, and/or follow-up actions were inadequate.
The ongoing training of personnel was inadequate. The job descriptions for personnel, the authority given to personnel, and/or the delegation of duties was inadequate and/or undocumented.
The temperature and/or humidity control was inadequate.
About this record
Extracted automatically from the document of the Health Canada inspection on 2025-02-27. The source is available at the link above.
This is a record of that moment. Inspection findings are usually followed by the company's response and corrective action, but this page does not know how that turned out. Do not read it as the current state; check the regulator's official announcements for the latest status.
Translation and classification are automated and may differ in nuance from the source.
