Skip to content

Inspection prep notes · Laboratory

Calibration and preventive maintenance

Also called: calibration, preventive maintenance

FDA looks less at whether calibration and preventive maintenance procedures exist than at whether instruments and equipment are calibrated and maintained on time, across their actual range of use, with records to show it. The findings below are quoted from warning letters and FDA 483s.

What inspectors cited

1Instruments were not calibrated regularly

For example, your pressure and vacuum gauges had not been calibrated since November 2020, despite subsequent continued manufacturing of medical gases using this equipment.

FDA Warning Letter · Greco Gas, Inc. · 2024-09-17 · View document

Specifically, probes used to monitor your Liquid Nitrogen Dewars for temperature and LN2 excursions are not regularly calibrated.

FDA 483 · SAFC Pharma Carlsbad · 2026-10-26 · View document

2Scales and balances were not calibrated across their actual range of use

You did not routinely calibrate your production scales used for weighing drug product components, including API, to reflect actual operating ranges. For example, your (b)(4) calibration check only documented one weight.

FDA Warning Letter · Lex Inc. · 2023-09-05 · View document

Specifically, your firm is not bracketing the range of use when calibrating the analytical balances used to weigh raw materials and/or perform in process weight checks during the preparation of sterile and non-sterile drug products.

FDA 483 · Petscript Inc · 2026-01-22 · View document

3Instruments past their calibration due date or out of calibration were used

Specifically, Your firm failed to document and investigate the use of an out-of-calibration thermometer during the filling of [redacted] cylinders.

FDA 483 · Galaxy Medical Products LLC · 2026-10-27

Technician was observed using out of calibration equipment (pipette and thermomixer) during the extraction step for mycoplasma testing on June 16, 2025.

FDA 483 · Clongen Laboratories, LLC · 2026-10-30 · View document

4Calibration records for scales were missing or not properly kept

Your scale calibration logs consisted of loose pages printed without unique identifiers.

FDA Warning Letter · Dynamic Blending Specialists, Inc. · 2025-07-08

There was no identification, calibration record, or usage log on a scale found in the raw material weighing and dispensing room.

FDA 483 · Qingdao Kangyuan Pharmaceutical Co., LTD · 2026-11-13 · View document

5The preventive maintenance program was not adequately established

Preventive maintenance of critical equipment is not established.

FDA 483 · Biotest AG · 2026-10-26 · View document

SOP, [redacted] Version 7.0, Preventative Maintenance (PM) Program, does not provide instructions for the assessment of equipment that is overdue for PM or calibration.

FDA 483 · SAFC Pharma Carlsbad · 2026-10-26 · View document

Questions to check against your procedures

  1. Are instruments such as gauges and probes calibrated at a defined interval?
  2. Does scale and balance calibration cover the range actually weighed?
  3. Is any instrument that is past its calibration due date or out of calibration in use?
  4. Is the use of an instrument past its calibration due date documented and investigated?
  5. Does each scale have identification, a calibration record and a usage log, and are those records kept as more than loose pages?
  6. Is preventive maintenance established for critical equipment, and does the procedure say how to assess equipment that is overdue?

Compiled by AI from public findings and checked by a person. Quotations are verbatim from the original documents; (b)(4) marks text redacted in the original. As of 2026-11-15.

Weekly Newsletter

New GMP inspection findings, every Monday

Every Monday we email the week's new inspection records from the FDA, EMA, Health Canada and MFDS, with a short summary of the week's regulatory news. We'll also let you know when the site gains new features. Unsubscribe any time with one click.

See recent findings first

Sent every Monday · a confirmation email follows when you subscribe · unsubscribe from the footer of any email.