What inspectors cited
1Stability data were not adequate to support the expiration date
Your QU also failed to ensure that adequate stability data supported the expiry of your drug products.
FDA Warning Letter · Zhejiang Gaorong Cosmetic Co., Ltd. · 2026-10-20
An adequate number of batches of each drug product are not tested nor are records of such data maintained to determine an appropriate expiration date.
FDA 483 · Glenmark Pharmaceuticals Inc USA · 2026-11-13 · View document
2Stability-indicating methods were not in place
Your firm has not established stability indicating methods for the OTC (b)(4) drug products you distribute to the U.S. market.
FDA Warning Letter · K.C. Pharmaceuticals, Inc. · 2026-08-18 · View document
The analytical method used for testing stability samples is not stability indicating and cannot identify degradation products.
FDA 483 · SNJ Labs Private Ltd. · 2026-08-05 · View document
3Annual stability batches required by procedure were not placed
Specifically, Based on SOP-003041575, “Stability Program,” at least [redacted] batch per year is required to be placed on stability under long-term conditions through the product shelf life. However, no annual stability batches were placed for [redacted] Tablets. [redacted] mg, representing batches manufactured in 2024.
FDA 483 · Mylan Laboratories Limited · 2026-10-19 · View document
Additionally, your firm's stability management procedure requires that at least one commercial batch be placed on stability annually; however, your firm does not follow this adequately.
FDA 483 · Shimoga Chemicals · 2026-10-23 · View document
4Stability testing was not performed at the planned time points
Specifically, your firm fails to follow SOP GL-059, Stability Program, effective date 10/23/2025, in that stability samples are not consistently tested within their respective testing windows.
FDA 483 · Granules Pharmaceuticals Inc. · 2026-10-23 · View document
Although it appears one batch was placed on stability for years 2021, 2022, and 2023, your firm only completed long-term stability testing to 6 months for these batches.
FDA 483 · Shimoga Chemicals · 2026-10-23 · View document
5Temperature and humidity in stability chambers were not controlled
Additionally, your sample storage chambers were observed to be powered off, and out-of-specification for temperature and/or humidity when powered on.
FDA Warning Letter · Shoolin Pharma Chem LLP · 2026-09-01
Additionally, stability chambers used in the study for accelerated and real-time conditions were not controlled for relative humidity.
FDA 483 · Laboratoires Anios · 2026-10-26
Questions to check against your procedures
- Is each labeled expiration date supported by stability data, and does the quality unit confirm it?
- Is an adequate number of batches tested to determine the expiration date, and are the records maintained?
- Are the analytical methods used for stability samples stability-indicating and able to identify degradation products?
- Is a commercial batch placed on stability every year as the procedure requires?
- Are stability samples tested within their testing windows, and is long-term testing completed through the last planned time point?
- Are stability chambers kept running, with temperature and relative humidity controlled within specification?