EU · EudraLex Vol.4
EU GMP Annex 1 8.60
8. Production and Specific Technologies › Moist heat sterilisation
Section text
Leak tests on the steriliser should be carried out periodically (normally weekly) when a vacuum phase is part of the cycle or the system is returned, post-sterilisation, to a pressure lower than the environment surrounding the steriliser.
Source: European Commission, DG SANTE · © European Union. Reuse is authorised provided the source is acknowledged (Commission Decision 2011/833/EU on the reuse of Commission documents). · retrieved 2026-11-15