Inspection Record

DPT Laboratories, Ltd. — Health Canada Inspection Findings

Health CanadaInspected 2024-05-06 3 findingsValidation and qualificationContamination controlComputer system validation

View the regulator's official source The source document is always the basis for judgement.

Findings

1Validation and qualification

The qualification and/or verification of utilities and/or support systems was inadequate.

2Contamination control

The sanitation programs were not adequately designed to identify and/or reduce the risks of contamination.

3Computer system validation

The calibration, inspection, and/or qualification of the equipment, including computerized systems, was inadequate.

About this record

Extracted automatically from the document of the Health Canada inspection on 2024-05-06. The source is available at the link above.

This is a record of that moment. Inspection findings are usually followed by the company's response and corrective action, but this page does not know how that turned out. Do not read it as the current state; check the regulator's official announcements for the latest status.

Translation and classification are automated and may differ in nuance from the source.