Inspection Record

Catalent Ontario Limited — Health Canada Inspection Findings

Health CanadaInspected 2025-08-18 5 findingsContamination controlComputer system validationOther quality systemLaboratory and QC controlsEquipment and facility

View the regulator's official source The source document is always the basis for judgement.

Findings

1Contamination control

The sanitation programs were not adequately designed to identify and/or reduce the risks of contamination.

2Computer system validation

The calibration, inspection, and/or qualification of the equipment, including computerized systems, was inadequate. The operation of the water purification equipment was inadequate for ensuring a reliable source of water.

3Other quality system

The handling of standard operating procedures for good manufacturing practices was inadequate.

4Laboratory and QC controls

The creation, maintenance, processing, and/or review of laboratory data was inadequate.

5Equipment and facility

Evaluation of production processes, equipment, and/or materials was inadequate.

About this record

Extracted automatically from the document of the Health Canada inspection on 2025-08-18. The source is available at the link above.

This is a record of that moment. Inspection findings are usually followed by the company's response and corrective action, but this page does not know how that turned out. Do not read it as the current state; check the regulator's official announcements for the latest status.

Translation and classification are automated and may differ in nuance from the source.

Other records for this company

Catalent Ontario Limited findings history — including this company's other documents Health Canada documents, 2025 Go to Findings search