EU · EudraLex Vol.4
EU GMP Part I, Chapter 6 6.33
On-going stability programme
조항 원문
In certain situations, additional batches should be included in the on-going stability programme. For example, an on-going stability study should be conducted after any significant change or significant deviation to the process or package. Any reworking, reprocessing or recovery operation should also be considered for inclusion.
본문은 원문(영어)입니다. 국문 번역은 준비 중입니다.
출처: European Commission, DG SANTE · © European Union. Reuse is authorised provided the source is acknowledged (Commission Decision 2011/833/EU on the reuse of Commission documents). · 수집일 2026-11-15