EU · EudraLex Vol.4
EU GMP Part I, Chapter 7 7.11
The Contract Acceptor
조항 원문
The Contract Acceptor should not subcontract to a third party any of the work entrusted to him under the Contract without the Contract Giver’s prior evaluation and approval of the arrangements. Arrangements made between the Contract Acceptor and any third party should ensure that information and knowledge, including those from assessments of the suitability of the third party, are made available in the same way as between the original Contract Giver and Contract Acceptor.
본문은 원문(영어)입니다. 국문 번역은 준비 중입니다.
출처: European Commission, DG SANTE · © European Union. Reuse is authorised provided the source is acknowledged (Commission Decision 2011/833/EU on the reuse of Commission documents). · 수집일 2026-11-15