EU · EudraLex Vol.4
EU GMP Part I, Chapter 7 7.6
The Contract Giver
조항 원문
The Contract Giver should provide the Contract Acceptor with all the information and knowledge necessary to carry out the contracted operations correctly in accordance with regulations in force, and the Marketing Authorisation for the product concerned. The Contract Giver should ensure that the Contract Acceptor is fully aware of any problems associated with the product or the work which might pose a hazard to his premises, equipment, personnel, other materials or other products.
본문은 원문(영어)입니다. 국문 번역은 준비 중입니다.
출처: European Commission, DG SANTE · © European Union. Reuse is authorised provided the source is acknowledged (Commission Decision 2011/833/EU on the reuse of Commission documents). · 수집일 2026-11-15