ICH
ICH Q7 8.11
8. PRODUCTION AND IN-PROCESS CONTROLS
조항 원문
If a material is subdivided for later use in production operations, the container receiving the material should be suitable and should be so identified that the following information is available:
- Material name and/or item code;
- Receiving or control number;
- Weight or measure of material in the new container; and
- Re-evaluation or retest date if appropriate.
본문은 원문(영어)입니다. 국문 번역은 준비 중입니다.
출처: International Council for Harmonisation (ICH) · © ICH. Per the legal notice in each guideline, the document may be used, reproduced and distributed provided ICH's copyright is acknowledged; any adaptation or translation must be labelled as such and must not imply ICH endorsement. · 수집일 2026-11-15